Projects

Industrial data

Data from industrial drilling

Amirig / Since 2018 · ongoing

We continue to develop and support Amirig, from drilling-site data collection to analytics and reporting.

Development and support

drilling sitedataanalysis
Conceptual illustration of industrial data moving from a drilling rig to analytics.
Data from the drilling rig provides the basis for analysis and reports.

01

Challenge

Work with drilling process data, from collection at the site to analysis and presentation.

02

Our contribution

Our work on Amirig includes DCDM, the analytics platform and additional modules. Development and support continue in 2026.

03

Solution

The work covers drilling-site data collection, analytics, reports, charts and service features.

04

Further development

A4 is planned for 2027. Work on the strategic direction is currently deferred; development and support of the current system continue.

From company records

Materials

Project in the timeline

2026

Amirig — continued maintenance and development of the drilling data system, from data collection at the rig to analytics and reporting. Work on the existing system continues; the next-generation Amirig A4 release is planned for 2027.

2021

Development of the Amirig platform: neural networks, reports/charts and service functionality

2020

Programming of additional functionality in the Amirig information system

2019

Software development: the Amirig Analytics analytical platform

2019

Programming of additional modules for the Amirig information system (DCDM)

Back to history

Start with your challenge

Tell us about your project.

Discuss a project